What The Client Wanted

We were contacted by our latest client to provide a full refurbishment and respray to a warehouse that was installed with cladded panels. The last time that the panels were coated was when they were installed more than 10-years ago.

What We Did

A team of two on site spraying professionals employed directly by CJ Coatings UK were tasked with completing the project.

However, there was a high risk of overspraying with the nearby vehicles and machinery. As a result, our team decided to complete the respraying works using the HVLP system instead of the usual airless spraying.

This resulted in two very long days to complete the works. However, the final outcome was perfect – providing our client with a perfectly coated warehouse, with no overspray present.

The Client’s Feedback

“We are very happy with the speed and accuracy of the works that CJ Coatings UK have completed. The two gentleman that were with us for the two days informed us of the HVLP system that they were intending on using so expected things to take a little longer. However, they both stayed longer than needed to ensure that it was all complete don time. We will certainly use CJ Coatings UK for our building maintenance in the future.”

Show more
Cladded warehouse before works
Show more
Maulden project pre spraying
Show more
First project before works
Show more
First project preparation
Show more
First phase preparation works
Show more
First project preparation work for spraying
Show more
First phase after spraying
Show more
Completed first project
Show more
Preparing the cladded panels for spraying
Show more
Second phase preparation
Show more
Second phase after spraying
Show more
Completed spraying on cladded panels
Show more
Second project preparation
Show more
After first two sprays complete
Show more
Phase three spraying
Show more
Final outcome after spraying